Release time : 2026-11-21 Source :Organizing Committee
A competitive-negotiation tender has been launched for consultancy services to prepare the project proposal and feasibility study for the Jiehua Green Power-to-Hydrogen Integrated Demonstration Project in Kaiyuan, Honghe Prefecture, Yunnan Province, China.
The tender, issued by Yunnan Green Energy Industry Group Co., Ltd., covers the preparation of the project proposal and feasibility study report. The tender reference number is YDZTF20262038.
According to the tender announcement, the project will be supported by surrounding renewable energy resources, with selected generating units from approximately 100 MW of planned renewable energy capacity serving as the project's power source.
The initial plan envisages allocating around 30 MW of renewable electricity capacity for hydrogen production. The final power supply capacity and the proportion of wind and solar generation will be determined through further assessments, taking into account local renewable energy resources, power project configuration and overall project economics.
The demonstration facility is planned to produce 1,000 metric tonnes of hydrogen annually.
The procurement covers consultancy services for preparing both the project proposal and the feasibility study report. The total budget is RMB 750,000 (approximately US$104,000), including RMB 80,000 (approximately US$11,100) allocated for the project proposal.
The tender also allows consortium bids.
